How will learn Quran Online, Is there any institution for online Quran Teaching.

How to debug the operation of concrete mixers
Total posts 109
Joined 8 year(s) ago
Posted 08:24 AM Friday, August 21, 2015   [ quote ]

Saying to test drive a new car, a new confidential commissioning. For new purchases of concrete mixers, our job is essential for a debugging operation. There are many customers tend to ignore this, and here we remind our customers, debugging operation is to discover whether the machine operating smoothly, does not start anomalies, convenient time for you to answer difficult manufacturer. How to debug the operation of this critical work, but also to you, follow these steps.
Planetary Concrete Mixers,mobile concrete plants for sale,portable diesel concrete mixer,

1, the new machine to first adjust the brace to put the machine to be placed well, remove the traction frame; secondly to clean the exterior of Fui Sha debris may stick to familiar method of operation of the machine parts for damage inspection departments , loose bolts, identify problems promptly corrected;

2. Check the electrical wiring installation and connection concrete mixer machine, the ground is safe and reliable. Power supply voltage is maintained at between 360V-380V is appropriate, too low will affect the performance of the machine, even the motor partially damaged.

3, check ministries grease is good, with particular attention to the inspection of lubricating oil in the gearbox, if water, impurities should be replaced, and to ensure that the ruler engraved lines between the upper and lower fuel; check motor their instruction manuals Be sure to meet the requirements.

4, the end of the starter motor pulley insert waving claws rotate, inspection departments functioning is good, whether the severity of the rotary waving jamming. Without exception, remove bade good place.

5, the pump filled water SICOMA Twin Shaft Compulsory Concrete Cement Mixer, close the water supply system valve, the suction valve vertically into the water, power should check the pump shaft rotation direction is correct, the rotation is uniform, can not have stuck, abnormal sound and other irregularities.

6. The control box should rise steadily up key dumpers, when up to a predetermined height and release the button dump stops rising and fall automatically to the card position, will overturn the anti-pull reset the rope Diesel mortar mixer, pulling the winch brake lever would be to dump ground fall. Trial several times.

7, installation lifting frame, checking each segment frame interface is consistent, whether the bolts tightened to minimize the tipping point of pulling the handle the material discharge port to respond positively tipper mouth.


Quick Reply